Saturday, October 30, 2010

Up Up and away.

Goodwin Alco’s support of Alco restoration moved “interstate” briefly in September to help our oldmates at ARHS ACT progress works on their World model DL500 Alco 4468.

With body restoration works well underway by the dedicated Canberra locals a work team comprising of Canberra fitter Gav, and representatives from Far North Rail Consultants, Goodwin Alco and the Lithgow Suit club gathered in the national capital to remove and strip the locos bogies in preparation for rewheeling.

1 end up

With the services of a very impressive crane, light work was made of the lifting and with 4468 positioned on temporary bogies, stripping of the 6 wheelset/traction motor combinations from the frames was completed ready for shipping.

bogie lift

3 days of team work saw the job finished with time to spare  and another great example of inter group working completed.

Time was also taken to inspect and document the condition of Canberras other DL500 the recently arrived RailCorp Core Heritage unit 4403. With a condition report prepared and submitted, corrective works are scheduled to commence soon and 4403 returned to mainline service.

wheels out

No comments: